Overview
1. Project Summary
| Project Name | Trusted Carbon Credit Tracking and Verification Platform |
|---|---|
| Project Code: | PRP/106/24CI |
| Project Type: | PRP Project |
| Project Period: | 2025-09-01 to 2027-02-28 (18 months) |
2. Project Objectives
-
R&D an independent Trusted Carbon Credit Tracking & Verification (TCCTV) Platform for the stakeholders of Carbon Credit Ecosystem: Project Owners / Consultants / Verifiers
- Reduce workload & cost
- Enhance carbon data trustworthiness
- Provide subscription-based platform services for operating carbon projects
-
Propose NEW Carbon Crediting Methodologies for Urban & Technology related projects
-
Drive More Carbon Reduction Projects in HK and Asia, firstly target Construction & Property Management
-
Facilitate HK as to be an International Carbon Market
3. Technical Approaches
- Workload & Cost: Digitalize & automate manual process of continuous tracking, calculation and verification
- Data Trust:
- Integrity: implement by Distributed Ledgers & Smart Contracts
- Greenwashing Prevention: Embed AI-enabled Consistency Check to detect fraud data fed into the platform
- Double Counting Risk Evaluation:
- build cross-registry Carbon Project Directory from major Carbon Registries
- create Evaluate Model for analyzing the similarity Carbon Project's geo-location and methodology
- Trials on TWO (2) Carbon Reduction Cases for illustration of the automated process & proposing new methodology
- Property Management: Energy Saving of Motto by Hilton HK SOHO Hotel
- Construction:
- Battery Energy Storage System (BESS) and diesel generator in construction site
- Propose a new Urban Crediting Methodology in CDM for industry adoption
4. Project Deliverables
| Item | Deliverables | Time Schedule | Date |
|---|---|---|---|
| 1 | Trusted Carbon Credit Tracking and Verification Platform | ||
| 1.1 | Carbon Tracing Module 1.1.a) Data Import Module 1.1.b) AI Consistency Check Module | T + 12 | 2026-08-31 |
| 1.2 | Carbon Tracking Module a) Blockchain Module for creating, updating and querying blockchain records b) Carbon Footprint Module according to Carbon Crediting Methodologies Industry Co-applicant will do accounting to verify Platform's Carbon Footprint is according to CDM Methodology | T + 12 | 2026-08-31 |
| 1.3 | Carbon Reporting Modules a) Carbon Footprint Reporting Module b) Carbon Reduction Reporting Module c) Double Counting Risk Module - Build cross-registry Carbon Project Directory Ingest > 1000 Carbon Projects from 3 Carbon Registries (Verra, Gold Standard and Cercarbono) - Assign Double Counting Risk using the location and methodology between two projects/proposals - Web portal for look up Carbon Projects and Double Counting Risk Industry Co-applicant will do accounting to verify > 40% man-day saving in account auditing | T + 15 | 2026-11-30 |
| 1.4 | Public Interfacing Modules a) Web Portal: User Interface for Carbon Data Query and Visualization b) Public API: Carbon Data Input and Query, handle > 100 data ingestions per minute per Carbon Project c) Notification Module: Notification for Detected Inconsistency | T + 15 | 2026-11-30 |
| 1.5 | Model Selection Module a) Training pipeline for 3 categories of anomaly detection models (Statistical, Classical ML, Deep Learning) with 15 hyper-parameters as Candidate Models, using Data from Industry Co-applicant in Trial #1 b) Evaluate the Candidate Models with Robust Rank Aggregation Algorithm to select the best model c) Selected model has AuROC accuracy > 0.8 on Industry Co-applicant's Dataset with synthetic anomaly injection | T + 12 | 2026-08-31 |
| 2.1 | Trial #1: Property Management – Energy Saving (Hotel) a) Integration with the Industry Co-applicant's existing Carbon Tracing Platform b) Carbon Footprint Report and Carbon Reduction Report for the trial period | T + 18 | 2027-02-28 |
| 2.2 | Trial #2: Construction Site: Hybrid Power Supply (BESS) a) Proposal of Hybrid Power Supply Carbon Emission Methodology for Carbon Credit Project b) Carbon Footprint Report and Carbon Reduction Report for the trial period | T + 18 | 2027-02-28 |
| 3 | Documentations and Technical Transfer | T + 18 | 2027-02-28 |